// field activity

Dev Log

Reverse-chronological. What shipped and when.

2026-04-23·OPS shipped·Private dashboard with 291 leads across 6 industries. Broadcast posted (Anthropic memory + Kimi vibe + HIPJOY moat).
2026-04-23·Studio + About deployed·Public-facing services page live. Hub sweep: age locked, affiliations stripped, mission + log + broadcast + research surfaces added.
2026-04-22·Portfolio rebuild·Operator-sovereign surface. Three-audience hero. PR #5 merged.
2026-04-21·Canon Path A locked·14 entities named. Roster applied across every public touchpoint.
2026-04-20·Hackathon → launch pivot·Cerebral Valley rejection. Public launch set April 26. Plugin scope locked: free, MIT.
2026-04-14·First broadcast·LinkedIn post live. Entity interview protocol drafted.
2026-04-10·Terrarium + LUX River + HIPXQL·Foundation shipped. First commit.